Milestone #1 is achieved — Thalia leaves our yard!

Karen and I talked about three critical milestones for us to accomplish before we left on our trip. The first was getting Thalia ready for the haul to Portland. The second was getting moved out of the house. And, the third was actually leaving Portland on our boat. We accomplished the first milestone today! Thalia was hauled away from our yard! Today’s work started at 5am with both Karen and I rolling on a fresh coat of bottom paint on the hull. We needed to give it a couple hours to dry before Dayton Marine showed up mid-day for the two hour haul to Portland. They showed up as scheduled, along with an escort car that is required because of Thalia’s beam (width) of 14 feet. The escort car also has a pole mounted on the front of the car that checks for height issues along the way.

 

Continue reading “Milestone #1 is achieved — Thalia leaves our yard!”